Home        Contact Us    
 

 

General Service Rates

Town Residential - 0001
Facilities Charge
$15.75
First 500 kWh
0.1123
All kWh over 500
0.0878
Rural Residential - 0002
Facilities Charge
$21.00
First 800 kWh
0.1191
All kWh over 800
0.0956
Non-Domestic - 0003
Facilities Charge
$28.25
All kWh
0.1285
Small Commercial - 0005-0005B
Facilities Charge 1 phase per month
$26.25
Facilities Charge 3 phase per month
$31.25
Energy Charge:  
  First 1000 kWh
0.1113
  All kWh over 1000
0.0904
Large Commercial - 0006-0006A
Facilities Charge 1 phase per month
$29.25
Facilities Charge 3 phase per month
$41.75
Demand Charge:  
Per metered kW
$5.75
Energy Charge:  
  First 10,000kWh
0.0815
  All kWh over 10,000
0.0711
Oil Well Pumping - 0007-0007A
Facilities Charge 1 phase per month
$29.25
Facilities Charge 3 phase per month
$41.75
Demand Charge:  
Per metered kW
$6.50
Energy Charge:  
  First 200 kWh per metered KW
0.0930
  Remaining energy per kWh
0.0669
Large Power - 0008
Facilities Charge per month
$510.00
Demand Charge:  
Per metered kW (100% ratchet) (plus kW line loss)
$4.75
  Coincident with K.C. Electric Peak
$21.50
Energy Charge:  
All kWh Purchased plus calculated line loss
0.0299
Irrigation - 0014
October through March Meter Readings:
$35.00
  First 150 kWh per metered horsepower
0.1035
  Remaining energy per kWh
0.0512
 
April through September Meter Readings:  
  First 150 kWh per meterred horsepower
0.1129
  Next 150 kWh per meterred horsepower
0.0805
  Remaining energy per kWh
0.0418
Street Lighting - 0015
175 Watt Mercury Vapor/Halide
$9.50
250 Watt Mercury Vapor/Halide
$12.75
400 Watt Mercury Vapor/Halide
$17.75
250 Watt High Pressure Sodium
$13.50
400 Watt High Pressure Sodium
$17.75
150 Watt Incandescent
$8.50
300 Watt Incandescent
$14.75