General Service Rates

Town Residential - 0001
Facilities Charge
$19.75
First 500 kWh
0.1145
All kWh over 500
0.0896
Rural Residential - 0002
Facilities Charge
$23.00
First 800 kWh
0.1215
All kWh over 800
0.0975
Non-Domestic - 0003
Facilities Charge
$26.25
All kWh
0.1315
Small Commercial - 0005-0005B
Facilities Charge 1 phase per month
$26.25
Facilities Charge 3 phase per month
$31.25
Energy Charge:  
  First 1000 kWh
0.1139
  All kWh over 1000
0.0925
Large Commercial - 0006-0006A
Facilities Charge 1 phase per month
$29.25
Facilities Charge 3 phase per month
$41.75
Demand Charge:  
Per metered kW
$5.75
Energy Charge:  
  First 10,000kWh
0.0848
  All kWh over 10,000
0.0739
Oil Well Pumping - 0007-0007A
Facilities Charge 1 phase per month
$29.25
Facilities Charge 3 phase per month
$41.75
Demand Charge:  
Per metered kW
$6.50
Energy Charge:  
  First 200 kWh per metered KW
0.0942
  Remaining energy per kWh
0.0681
Large Power - 0008
Facilities Charge per month
$ 610.00
Demand Charge:  
Per metered kW (100% ratchet) (plus kW line loss)
$4.75
  Coincident with K.C. Electric Peak
$21.50
Energy Charge:  
All kWh Purchased plus calculated line loss
0.0311
Irrigation - 0014
Annual Facility Charge-per metered horsepower (billed in March)
16.00
October through March Meter Readings:
  First 150 kWh per metered horsepower
0.1035
  Remaining energy per kWh
0.0512
 
April through September Meter Readings:  
  First 150 kWh per meterred horsepower
0.1129
  Next 150 kWh per meterred horsepower
0.0805
  Remaining energy per kWh
0.0418
Street Lighting - 0015
175 Watt Mercury Vapor/Halide
$9.50
250 Watt Mercury Vapor/Halide
$12.75
400 Watt Mercury Vapor/Halide
$17.75
250 Watt High Pressure Sodium
$13.50
400 Watt High Pressure Sodium
$17.75
150 Watt Incandescent
$8.50
300 Watt Incandescent
$14.75

 

 

Board Only